Thursday, October 22, 2020

Measurement Sheet for Interim Bill [excel format]

This measurement sheet is not a TDS Sheet (Traditional dimension sheet). This is a non-standard dimension sheet, mostly used by engineers and building contractor's qs.

Read more about; Bill of Quantities


Measurement sheet is used to attach with the interim bill to mention actual measurement of the complete work item in the bill of quantity.


Normally, printed on A4 paper, it has 6 columns excluding the binding column.

The columns are:


First column; Bill Item number.

Second column; Description column (For item descriptions and waste calculations)

Third column; Timesing column also called the Number column (for entering multiplication factors and enumerated items)

Fourth column; Length column (Dimension column for Length)

Fifth column; Breath (Width) column (Dimension column for Width)

Sixth column; Height column (Dimension column for Height or Depth)

Seventh column; Quantity column also called the Summation column

Eight column; Total quantity column (For entering the total quantity).

Ninth column; Remarks column (For entering the additional remark).

Measurement Sheet

measurement sheet





Read more about; Introduction about taking off quantities

Principles in taking off quantities

Direct Cost and Indirect Cost

No comments:

Post a Comment